BRASS developed a feasibility engineering service (FEL 3) for an industrial project in Peru's mining sector.
The request was aimed at evaluating and comparing development alternatives through comparative analyses (trade-offs), interface coordination, and technical governance.
The scope included regular coordination meetings and participation in multidisciplinary workshops, addressing critical issues such as risks, design safety, constructability, operability, maintainability, energy efficiency, and environmental and permitting considerations.
As a result, engineering deliverables and supporting documentation were produced to aid in decision-making and prepare for subsequent project phases. Additionally, a collaborative BIM approach was implemented for 3D modeling and construction planning, enhancing technical consistency and traceability across disciplines.



Cookies on this site
We use our own and third-party cookies to keep the site working properly and to understand how it is used. You can accept all of them or keep only the necessary ones.