BRASS carried out the feasibility engineering, detailed engineering, and on-site support for the project.
The challenge was to transport the tailings to the tail end of the Las Tórtolas Dam, a task that involved all engineering disciplines.
The scope included hydraulic, mechanical, piping, civil, structural, electrical, and instrumentation design. In addition, BRASS developed the CAPEX estimate, construction planning, risk analysis, HAZOP, constructability analysis, and support for project permits.
The project included hydraulic modeling of thickened tailings transport, design of a pumping station, discharge pipelines, an emergency settling basin, transfer boxes, and control systems. The system was designed to operate with both thickened tailings and conventional tailings, with the latter serving as an operational backup in the event of contingencies or thickener maintenance.


Cookies on this site
We use our own and third-party cookies to keep the site working properly and to understand how it is used. You can accept all of them or keep only the necessary ones.