Detailed and Site Engineering for Tailings Conveyance
LT1 Plant at the Tailings Pond of the Las Tórtolas Operation

BRASS carried out the feasibility engineering, detailed engineering, and on-site support for the project.

The challenge

The challenge was to transport the tailings to the tail end of the Las Tórtolas Dam, a task that involved all engineering disciplines.

Context

The scope included hydraulic, mechanical, piping, civil, structural, electrical, and instrumentation design. In addition, BRASS developed the CAPEX estimate, construction planning, risk analysis, HAZOP, constructability analysis, and support for project permits.

The BRASS Solution

The project included hydraulic modeling of thickened tailings transport, design of a pumping station, discharge pipelines, an emergency settling basin, transfer boxes, and control systems. The system was designed to operate with both thickened tailings and conventional tailings, with the latter serving as an operational backup in the event of contingencies or thickener maintenance.

Key aspects of the design carried out

Interpretation of control system concepts
Interdisciplinarity
Multiple disciplines needed to collaborate and share their expertise in order to build a unified body of knowledge.
Comply with technical and regulatory requirements
Comprehensive Services
Multidisciplinary engineering, economic evaluation, risks, and permits.