Basic Engineering for Waste Disposal - Brazil
Mina Sossego

BRASS was contracted to develop the basic engineering for the new tailings disposal system.

The challenge

The objective of the project was to replace the existing tailings pond by using the Sossego, Sequeirinho, and Pista tailings ponds for the disposal of thickened tailings. The scope included the comprehensive development of the pulp transport systems, overflow and pumping water between the cellars and to the water recovery system.

Context

The technical proposal included integrated multidisciplinary engineering solutions, such as 3D modeling, the creation of 2D deliverables, and a digital model. Laboratory tests were conducted on rheology, abrasiveness, corrosion, pH, and particle size distribution, among other factors, in addition to hydraulic analyses, electrical studies, and conceptual design of stations. booster intermediate facilities, mobile power stations, and catchment tanks, along with auxiliary service systems, automation, and infrastructure.

The BRASS Solution

BRASS incorporated its own technologies, such as the B-LDS® leak detection system and the B-VOYAGER® device for internal pipeline monitoring, while also ensuring the client’s compliance. By participating in every stage from diagnosis to engineering design, BRASS addressed operational bottlenecks, ensured water and operational safety, and developed scalable solutions that made it possible to leverage the existing infrastructure.

Key aspects of the design carried out

Monitoring and Diagnostics
Applied Technologies
Integration of BRASS's proprietary technological innovations for leak detection and internal pipeline monitoring
Interpretation of control system concepts
Multidisciplinary engineering
Integration of multiple disciplines to develop a comprehensive, operationally safe solution.