BRASS was responsible for the complete development of the conceptual, basic, and detailed engineering for the new water intake and conveyance system from the Zambezi River to the existing facilities at VALE’s Moatize coal mine in Mozambique.
The project, which was wide-ranging and highly complex from a technical standpoint, encompassed everything from the simulation and sizing of the intake channel to the construction of 21 km of buried and overhead transmission pipelines, as well as CapEx and OpEx studies, using engineering solutions tailored to the project’s requirements.
Key technical deliverables included steady-state and transient hydraulic analyses, mechanical and structural configurations, cathodic protection design, automation and instrumentation, as well as integrated 3D modeling using the BIM 360 platform. BRASS also incorporated its own technologies, such as the leak detection system (B-LDS®) and the B-VOYAGER® device, demonstrating technical expertise and innovation.
The work carried out by BRASS made it possible to address gaps arising from earlier stages of the project, validating and optimizing the designs provided by VALE and ensuring operational safety, accuracy of documentation, and adherence to the schedule—even in an adverse international context. The team’s multidisciplinary expertise enabled VALE to achieve greater reliability in the water supply for its operations, mitigating risks and promoting sustainability throughout the entire project chain.


Cookies on this site
We use our own and third-party cookies to keep the site working properly and to understand how it is used. You can accept all of them or keep only the necessary ones.