El Proyecto Básico del Sistema de Captación de Agua en el Arroyo Monjolos, ubicado en la Mina de Água Limpa (Complejo Minas Centrais), en Minas Gerais, fue desarrollado por BRASS en 2025 con el objetivo de optimizar el abastecimiento hídrico de la planta, garantizando la continuidad operacional.
The scope of work encompassed the design and sizing of an efficient water intake and pumping solution, including redesigning the hydraulic route by leveraging existing infrastructure and implementing a direct pumping line. This approach reduced operational complexity and significantly increased system reliability.
The project also incorporated strategic guidelines related to scalability, sustainability, operational safety and regulatory compliance, including technical support for granting processes and environmental adjustments.
The project is notable for its integrated, multidisciplinary approach, involving the areas of hydraulic, mechanical, electrical, automation, infrastructure, geotechnical, and environmental engineering. Hydrological studies, technical design, equipment specifications, control and instrumentation systems were developed, and essential technical documentation was prepared for acquisition processes and future system expansions.



Cookies on this site
We use our own and third-party cookies to keep the site working properly and to understand how it is used. You can accept all of them or keep only the necessary ones.